发行时间:2020.01.11
总页数:25
编辑:
综保科技
摘要:
Report to Congress on the Annual Long-Range Plan for Construction of Naval Vessels for Fiscal Year 2020
Prepared by: Office of the Chief of Naval Operations Deputy Chief of Naval Operations (Warfare System Requirements - OPNAV N9) 2000 Navy Pentagon Washington, DC 20350-2000
March 2019
The estimated cost of this report or study for the Department of Defense is approximately $313,000 in Fiscal Years 2018 - 2019. This includes $19,000 in expenses and $294,000 in DoD labor.
2019Mar05 RefID: 0-26726...